Cyberia team carried out the early-stage installation of ventilation ducts for a residential project in Kuwait, which included residential plots and villas under construction. The galvanized ductwork was installed during the structural phase and before the finishing works to ensure full integration with the building from the outset and to avoid any later modifications or demolition work.